Chambers Dam Reservoir
Project Name: Chambers Reservoir
Project Date: 2020
Project Location: Douglas County, CO
Project Market: Raw Water Storage
Project Specs: AECOM for the Arapahoe County Water and Wastewater Authority, Centennial Colorado
Viaflex Material Used: 1.83 million square feet of 16 oz. Geotextile and DuraSkrim N45BT – 45 mil Black/Tan scrim reinforced LLDPE Geomembrane
Project Recognition
2020 Top Project of the Year by the Colorado Contractors Association
Project Description
Phase II of the Chambers Reservoir project consisted of upgrading an existing earthen raw water storage reservoir and fabricating and installing a 45 Mil Black / Tan – N45BT (Scrim reinforced LLDPE.) with a 16oz. geotextile underlayment for protection. Furthermore, 6,600 LF of black safety ladders were installed in various spots around the perimeter to ensure safety while accessing or egressing the reservoir.
Lessons Learned
The use of the scrim reinforced LLDPE greatly reduced slope creep & wrinkles at the toe of slope that is common for reservoirs of this size. Furthermore, the use of intermittent berms across the floor prevented erosion and subgrade issues from rain events throughout the installation process.
How the Use of Fabrication Improved This Project
Large prefabricated panels gave Viaflex Inc. the ability to maximize production and shorten the overall installation time greatly – something that was crucial to beat owner deadlines and the fall / winter weather common for Colorado.