Project Name: Salt Lake City International Airport

Project Location: Salt Lake City, UT

Project Market: Quick Deployment Pond Liner

Material Used: Absolute Barrier® Y30BAC

Project Challenges:

  • A short, one-week timeline available for project completion
  • The liner had to be a barrier impervious to the VOCs

Project Overview

由于正在进行重建计划,盐湖城机场正在持续施工。机场周围的扩建工程需要为可能受到污染的径流建造隔离区。其中一个区域必须在一周内完成建造和内衬。此外,衬垫还必须不透径流中的挥发性有机化合物。我们需要一种快速部署的衬垫,但不是普通的衬垫。

Project Solution

The proposed solution was the use of the Absolute Barrier® Y30BAC. The Y-Series Absolute Barrier® is capable of containing both the liquid and vapor forms of the dissolved VOCs. The ability to do both is not available from any other lining system. Also, due to the flexible nature of the Y series, one large factory-assembled panel was delivered to the site. With this panel, the contractor was able to deploy the liner and complete the installation in one day. These large panels are assembled under strict quality-controlled measures to ensure clean seaming on panel assemblies for proper field performance. They also minimize the amount of required field seams and increase the long-term reliability of the system. The use of large panels, by virtue of the reduced time and labor required to install the large panels, also reduces overall project costs.

项目图片

Custom fabrication operation

Packaged panel being opened and unrolled into place

Panel of Y30BAC being opened and installed